Completed in 2025, the Xuesong Road Viaduct extends westward starting 200 m west of Dingxiang Intersection. It crosses the Shenyang‑Dalian Expressway and Bayi Irrigation Channel before landing roughly 200 m east of Guixiang Street (S109), where an at‑grade intersection is arranged for connection with Guixiang Street. The pile number range of the Xuesong Road Overpass Bridge is K0+874.5 ~ K1+409.5, with a total length of 535 m. A 1‑span 55 m simply‑supported steel box girder is adopted for the section crossing the Shenyang‑Dalian Expressway, constructed by the incremental launching method.


Online Message
Learn about our latest products and discounts through SMS or email
YOU MAY LIKE







