Built in 2024 as the west section of Phase‑II for the South‑Shift 2nd Ring Road Project, the Nanyanghu Street Viaduct lies on Nanyanghu Street in Yuhong New Town, Shenyang. The project runs from North Xiannühe Road in the north to Nanyanghu Bridge in the south, tracing the existing Nanyanghu Street. It passes Xiannühe Road, Xihe Road, South Xihe Road, Wanghe Road, South Wanghe Road and Dadi Road, with a total length of approximately 3.28 km. A viaduct is constructed along the route, starting north of Xiannühe Road and ending at the abutment of Nanyanghu Bridge, with a length of 2.79 km. The main‑line viaduct is configured with six lanes in both directions. The ground auxiliary road optimizes and reconstructs the existing Nanyanghu Street. Its standard section adopts six lanes in both directions, and the ground road totals 3.28 km.