Title: 21 Beam Sections, One Frame: H750×320×16×20 Down to H250×150×6×8


Overview

A steel frame is not one beam repeated. It is a family of sections: deep girders over long spans, mid-size beams at secondary gridlines, light beams under slabs. Get the family right and the frame is economical; over-specify one section everywhere and you pay for steel you do not need.

This project's schedule lists 21 beam types — 13 frame beams (GL) and 8 composite/secondary beams (GCL) — all in Q355B, running from H750×320×16×20 down to H250×150×6×8.


blog-273-464


Frame Beams — GL Series (from Drawing)

 

Mark Name Section (H×B×tw×tf) Grade kg/m*
GL1 Frame beam H700×320×12×20 Q355B 162.7
GL2 Frame beam H400×200×8×12 Q355B 61.3
GL3 Frame beam H500×220×10×14 Q355B 85.4
GL4 Frame beam H600×250×10×14 Q355B 99.9
GL5 Frame beam H500×200×8×12 Q355B 67.6
GL6 Frame beam H700×280×12×16 Q355B 133.3
GL7 Frame beam H600×220×10×12 Q355B 86.7
GL8 Frame beam H750×320×16×20 Q355B 189.7
GL9 Frame beam H300×180×6×10 Q355B 41.4
GL10 Frame beam H700×250×12×14 Q355B 118.3
GL11 Frame beam H650×220×12×14 Q355B 106.9
GL12 Frame beam H700×270×12×16 Q355B 130.7
GL13 Frame beam H650×250×12×14 Q355B 113.5

*kg/m calculated from the section dimensions at 7,850 kg/m³; the drawing gives sections only.


blog-563-435


Composite and Secondary Beams — GCL Series (from Drawing)

 

Mark Name Section Grade kg/m*
GCL1 Steel-concrete composite beam H500×200×6×8 Q355B 47.9
GCL2 Steel-concrete composite beam H450×180×6×8 Q355B 43.0
GCL3 Secondary beam H350×200×6×8 Q355B 40.9
GCL4 Steel-concrete composite beam H600×220×6×10 Q355B 61.9
GCL5 Steel-concrete composite beam H700×200×8×14 Q355B 86.2
GCL6 Secondary beam H250×150×6×8 Q355B 29.9
GCL7 Steel-concrete composite beam H700×280×8×14 Q355B 103.7
GCL8 Steel-concrete composite beam H500×200×8×12 Q355B 67.6

Layout (from Drawing)

 

Item Value
Plans Beam layout plans at two levels
Grid Axes ①–⑱ and Ⓐ–Ⓔ
Beam callouts GL / GCL marks at each bay and gridline

What the Sections Tell You

  • Depth tracks span. H750 for the long span, H600–H700 for the main frame lines, H300–H400 where spans are short or loads light.
  • Flange thickness tracks moment. GL8 has 20 mm flanges at 320 wide; GL9 has 10 mm at 180 — four times the bending capacity, not four times the weight.
  • Composite beams are thinner in the web. GCL sections run 6–8 mm webs against 10–16 mm on the GL beams; the concrete slab takes the compression, so the steel does less.
  • One grade throughout. All 21 sections are Q355B — one steel to buy, one welding procedure, one set of consumables.

Advantages

  1. Steel where it is needed — 21 sections instead of 3 means the deep beams carry the span and the light beams carry only the slab.
  2. One grade — Q355B across the frame simplifies procurement, welding procedure, and inspection.
  3. Composite option — the GCL series lets the slab work with the steel, cutting beam weight under floors.
  4. Standard shapes — H-sections are familiar to every fabricator; detailing and connections follow normal practice.
  5. Clear take-off — a marked schedule means the estimator, the shop, and the site all read the same list.

Disadvantages / Limitations

  1. Many types to track — 21 marks means 21 nesting lists, 21 labels, and more chance of a beam going to the wrong bay.
  2. Heavy sections are hard to handle — H750×320×16×20 at ~190 kg/m is a crane lift, not a two-man carry.
  3. Composite beams need shear connection — the GCL series only works if the studs and slab are built as designed.
  4. Welded sections need checking — deep webs at 12–16 mm need stiffeners and weld inspection; rolled availability varies by size.
  5. Coordination load — beams, slab, and openings all compete for the same space; late changes hit several marks at once.

Typical Use Cases

  1. Industrial and warehouse frames — main girders on the long spans, secondary beams between.
  2. Multi-storey steel frames with concrete slabs — GCL composite beams under the floor.
  3. Mezzanine and platform framing — mixed GL/GCL layout at one level.
  4. Long-span roof structures — H700–H750 girders where deflection governs.
  5. Frames with mixed loads — heavy equipment on part of the floor, light storage elsewhere.

blog-946-499


Fabrication and Erection Notes

  • Check each mark against the plan before fabrication; GL and GCL sections are not interchangeable.
  • For welded sections, set camber on the deep girders (GL1, GL6, GL8, GL10, GL12) before welding.
  • Stiffeners at load points and at the connections; follow the connection details, not the schedule alone.
  • Composite beams: place shear studs before the slab; confirm stud layout with the deck drawing.
  • Label every member with its mark at the shop and keep the label visible until it is erected.
  • Sequence: main frame beams first, secondary beams second, slab last.

Bottom Line

21 sections, one grade, one frame. The schedule does the work a good design should: H750 where the span is long, H300 where it is short, 6 mm webs where the slab helps, 20 mm flanges where the moment is high. Buy one steel, cut it to the list, and label every piece — the frame goes together in the order the drawing says.