29.94 m Span, 37.9 m Wide: Multi-Cell Steel Box Girder

2026-11-11 20:18:15

29.94 m Span, 37.9 m Wide: Multi-Cell Steel Box Girder

English Version

Title: 29.94 m Span, 37.9 m Wide: Steel Box Girder That Crosses a Live Highway


Overview

A steel box girder is the go-to choice when a bridge has to cross something that cannot be closed — a motorway, a canal, a rail line. The girder is fabricated off site, lifted in a few nights, and the traffic below never stops for long.

This is the first span of such a bridge: 29.94 m, 37.9 m wide, multi-cell boxes under each half, 2.2 m deep at the supports and 2.0 m at mid-span.


blog-799-336


Geometry (from Drawing)

 

Item Value
Span 29,940 mm
Drawn length 30,000 mm (incl. 60 mm at each end)
Girder depth 2,200 mm at supports / 2,000 mm at mid-span
Overall width 37,900 mm
Half width 17,000 mm each side
Cross fall 1.5%
Vent holes φ80
Drainage holes φ50

blog-490-360


Deck Layout (from Drawing)

 

Item Value
Footway 2,000 mm
Cycle lane 3,500 mm
Motor lanes 3,500 / 3,250 / 3,250 mm per half
Wearing course 9 cm asphalt concrete
Waterproofing membrane between asphalt and concrete
Leveling layer 8 cm C50 concrete

Box Section and Segments

表格

Item Value
Section Multi-cell box, three cells per half plus cantilever
Webs Inclined
Segment chain 60 / 590 / 1,210 / 2,000 / 4,000 / 2,500 / 12,540 / 6,000 / 1,100 mm
Bearings Bearing center lines marked at both ends, with bearing pads

Substructure (from Drawing)

 

Item Value
Cap beam 200 mm deep, 215 mm cantilever each side
Column Tapered (vase-shaped) pier
Piles D1.0 / D1.2, spaced 300 mm apart in the group
Site Bridge crosses the Shenyang–Dalian expressway and the Bayi canal

blog-803-270


Advantages

Erection without closing the road — segments are lifted at night; the expressway below stays open.

Light for its span — a 29.94 m steel box weighs a fraction of a concrete girder, so smaller cranes and lighter temporary works.

Multi-cell stiffness — three cells per half resist torsion and local buckling; the deck does not need a thick slab.

Shallow depth — 2.0–2.2 m for a 30 m span leaves room for clearance and approach grades.

Factory quality — welding and coating are done indoors, inspected before the girder leaves the shop.


Disadvantages / Limitations

Welding volume is huge — every cell, diaphragm, and stiffener is welded; distortion control is a full-time job.

Fatigue at details — box girders live with cyclic traffic load; weld details at diaphragms and stiffeners need careful design.

Coating maintenance — a box interior is hard to inspect and repaint; closed cells need dehumidification or sealed access.

Erection needs road closure windows — even night lifts need permits, cranes, and traffic management.

Cost — steel box girders are expensive per tonne and per square metre compared with a concrete deck.


Typical Use Cases

Expressway overpasses — crossing a live motorway, as in this drawing.

Canal and river crossings — spans where a concrete girder would need too much temporary support.

Urban viaducts — wide decks (37.9 m here) over traffic that cannot stop.

Rail and metro overpasses — short erection windows, high precision.

Bridge replacement — new steel span lifted into an existing alignment.


Fabrication and Erection Notes

Fabricate the box in cells: bottom plate, webs, diaphragms, top plate; check camber before closing the top.

Vent holes φ80 and drain holes φ50 per drawing; keep them clear and locate them at low points.

Coat the interior before closing; seal cells and record access points.

Leveling layer: 8 cm C50 over the steel deck, then waterproofing, then 9 cm asphalt — cure before paving.

Bearings: set pads on the bearing center lines at both ends; check the 2,200 mm end depth against the support.

Erection: night lifts with a road closure permit; check the cross fall (1.5%) before releasing the crane.


Bottom Line

29.94 m of span, 37.9 m of width, three cells per half, 2.0–2.2 m deep — this is a box girder built to cross a highway without stopping it. The steel does the work; the 8 cm C50 layer, the waterproofing, and the 9 cm asphalt keep the deck serviceable. Fabricate it straight, coat it inside, and lift it at night