Drawing note: section size, chord numbering and section labels are read from the GGZ2 plan detail and the four column sections. Chord section, lacing size, steel grade, column height, bay spacing, member weight, bolts and foundation are not legible in this batch; they remain on the original material schedule and detail drawings.
GGZ2 is a lattice (built-up) column in a multi-bay, multi-storey steel frame. The plan detail shows a 2,000×2,000 mm square section with four corner chords numbered 1, 2, 3 and 4; the frame axis is offset 200 mm from the section edge. Four column sections are drawn: 1-1 and 2-2 along axes 1–2, and 3-3 and 4-4 along axes B–C. Each section shows two side chords tied by diagonal cross lacing and horizontal battens, finishing at a base plate on the foundation.

Readable Drawing Data
| Item | Value |
|---|---|
| Column mark | GGZ2 lattice column |
| Plan section | 2,000 × 2,000 mm square |
| Corner chords | 4, numbered 1, 2, 3, 4 |
| Axis offset | 200 mm from section edge |
| Sections | 1-1, 2-2 (axes 1→2); 3-3, 4-4 (axes B→C) |
| Lacing system | Diagonal cross lacing between chords; horizontal battens at intervals |
| Base | Column base plate at foundation level |
| Frame context | Multi-bay frame, lattice columns paired with trussed beams; axes 1, 2, 3, 4, 7, 8, 10, 12, 14, 17, 19 |

How the Lattice Column Works
Four chords carry axial force. Corner chords share column compression and tension; the open box keeps material placed at the corners where lever arm is largest.
Cross lacing ties the chords together. Diagonal members transfer shear between chords and keep them acting as one built-up section.
Horizontal battens control chord spacing. Battens divide the column into panels, stopping individual chord buckling between lacing nodes.
Base plate spreads the reaction. The column foot transfers chord and lacing forces to the foundation through the base plate and anchor bolts.
Frame beams load the column. Trussed beams at each level deliver floor and roof loads to the lattice column, which carries the combined axial force and moment to the base.
Light built-up section — chords and lacing use less steel than a solid box or heavy H column for the same overall depth.
Large lever arm at low weight — material at the four corners gives strong bending resistance with an open, economical section.
Open for inspection — the lattice face allows access for coating, welding inspection and later maintenance.
Scalable panel layout — chord spacing and lacing pitch can match different heights and loads; four section types cover the column lines in the frame.
Standardized base — chords converge on a common base plate, simplifying foundation and anchor layout.

Disadvantages / Limits
Fabrication is labor-intensive — chord cutting, lacing welding and batten fitting take more shop work than a rolled section; weld quality must be checked.
Local buckling of chords — chord slenderness between battens must be limited; over-long batten spacing weakens the section.
Open face traps dirt and moisture — exposed lacing gaps need painting, drainage and periodic inspection against corrosion.
End and base detail matters — base plate, stiffeners and anchor bolts control load transfer; this batch does not list their size.
Data gaps on these drawings — chord section, lacing specification, steel grade, column height, bay spacing, member weight and bolt grade are not legible; capacity and takeoff need the original design.
Industrial workshop and portal-frame columns carrying roof and crane loads.
Multi-bay multi-storey steel frame columns where a deep, light built-up section is needed.
Large-span platform and trestle support columns.
Heavy-duty plant and equipment support frames.
Retrofit columns added to an existing frame where a solid heavy section cannot fit.
Confirm chord section, lacing size, steel grade and weld category from the original schedule before fabrication.
Lay out the 2,000×2,000 mm plan; check the 200 mm axis offset and chord positions 1–4 against the GGZ2 detail.
Weld chords to battens first, then fit diagonal lacing; keep chord spacing straight along the full column height.
Check lacing node welds and batten spacing per section 1-1 to 4-4; mark inspected welds.
Set the column on the base plate; plumb the column in both directions before tightening anchor bolts.
Coat chord and lacing faces after inspection; keep lacing gaps free of debris and sealant.
GGZ2 is a four-chord lattice column with a 2,000×2,000 mm plan, diagonal cross lacing and horizontal battens, detailed in four sections (1-1, 2-2, 3-3, 4-4) for a multi-bay multi-storey steel frame. Section size and chord numbering come from the drawings; chord and lacing sections, grade, height, weight and base details follow the original structural design.