3 Purlin Types, 1,465 mm Spacing: 2C250×75×20 Twin-C and H300×150 High-Frequency Welded H Sections, Q355B Roof Framing

2026-11-28 14:10:47

3 Purlin Types, 1,465 mm Spacing: 2C250×75×20 Twin-C and H300×150 High-Frequency Welded H Sections, Q355B Roof Framing

English Version

Title: Steel Roof Purlin System — LT1 2C250×75×20×2.2 Twin-C, LT2/LT3 H300×150 High-Frequency Welded H, Q355B, 1,465 mm Main Spacing, Multi-Bay Roof Frame

Drawing note: sections and grades are read from the section table; purlin spacing and axis layout from the two roof plans. This batch does not list purlin length, count, weight, roof panel gauge, roof slope or wind load; those remain on the original roof schedule and structural drawings.


Overview

This is the purlin layer above the roof frame. Three Q355B section types are used: LT1 a back-to-back double C purlin 2C250×75×20×2.2, and two high-frequency welded H purlins — LT2 H300×150×3.2×4.5 and LT3 H300×150×4.5×6. Purlins run across the roof bays at a main spacing of 1,465 mm, with 1,000–1,011 mm edge spacing. Horizontal bracing fills the panel triangles between purlin lines; openings and equipment zones are shown as framed rectangles.


Section Table

表格

Mark Section Type Grade
LT1 2C250×75×20×2.2, channels back-to-back Cold-formed C section, double channel Q355B
LT2 H300×150×3.2×4.5 High-frequency welded H section Q355B
LT3 H300×150×4.5×6 High-frequency welded H section Q355B

Section format: H depth × flange width × web thickness × flange thickness; C depth × leg × lip × wall thickness.


blog-630-271


Plan Layout

 

Item Value
Main purlin spacing 1,465 mm repeated across bays
Edge purlin spacing 1,000 / 1,011 mm
Plan 1 axes (transverse) 9, 10, 12, 14, 17, 19
Plan 1 axes (longitudinal) D, E, G, H, J, L, M
Plan 1 transverse bays 1,810 / 8,004 / 8,333 / 14,776 / 3,010 mm
Plan 1 longitudinal zones 635 / 630 / 475 / 2,624 / 475 / 450 / 550 mm
Plan 2 axes (transverse) 1, 2, 3, 4, 7, 9, 10
Associated framing Main frame beams, horizontal bracing, framed openings

blog-699-635


How the Roof Purlin Works

  • Purlins carry the roof panel. Purlins span between main frame beams and transfer panel dead weight, snow and wind uplift to the frame.
  • Double C matches medium spans. LT1 twin C channels act compositely as a built-up section for purlin lines needing extra stiffness.
  • H sections cover longer or heavier bays. LT2 and LT3 high-frequency welded H purlins carry deeper loads; web and flange thickness rise from 3.2/4.5 on LT2 to 4.5/6 on LT3.
  • Bracing stabilizes the roof plane. Horizontal bracing triangles between purlin lines resist wind and erection sway, tying purlins to the frame.
  • Openings stay framed. Rectangular zones around skylights, vents or equipment are kept within the purlin and beam grid.

blog-515-559


Advantages

  1. Section range matches span — twin C, light H and heavy H cover short, medium and long purlin lines without over-sizing.
  2. Q355B throughout — one structural grade across purlins, consistent procurement and welding qualification.
  3. Regular 1,465 mm spacing — repeated bay rhythm simplifies panel cutting, fixing and future opening layout.
  4. High-frequency welded H — thin web, controlled welding, lighter than a rolled H for the same depth.
  5. Shop-ready members — sections are standardized for shop cutting, hole drilling and site bolted fixing.

Disadvantages / Limits

  1. Purlin load data missing — snow load, wind suction, panel weight and purlin span are not listed; section selection must be checked against the design roof load.
  2. Lateral torsional buckling — purlins need panel restraint or sag rods; unsupported H purlins can twist under uplift or gravity load.
  3. Built-up double C fit-up — back-to-back channels must stay in contact; gaps or missing fixing reduce the composite section.
  4. Roof panel and fixings unspecified — panel profile, gauge, fastener type and spacing are not in this batch; diaphragm action depends on the panel system.
  5. Data gaps — purlin length, quantity, member weight, connector cleats and bracing rod size are not given; takeoff needs the original material schedule.

Typical Use Cases

  1. Industrial workshop roofs on steel portal frames.
  2. Warehouse and logistics building roofs with regular purlin grids.
  3. Multi-bay steel factory roofs with equipment, vent or skylight openings.
  4. Commercial and exhibition steel roof framing.
  5. Retrofit roof purlin replacement over an existing frame.

Fabrication and Erection Notes

  • Verify Q355B material certificates for C and H sections; confirm purlin grade against each marked location.
  • Set out the 1,465 mm main grid and 1,000–1,011 mm edge lines from the frame axes; check the opening rectangles before fixing purlins.
  • Place LT1 twin C on medium lines, LT2/LT3 H purlins on long or loaded lines; do not substitute sections without design review.
  • Install horizontal bracing triangles before laying panels; check purlin alignment and sag-rod tension.
  • Match connection cleats and bolt holes to the main frame beam; tighten bolts to the specified torque.
  • Coat exposed ends and contact surfaces; keep drainage slopes and panel fixing lines clear.

Bottom Line

A Q355B steel roof purlin system: LT1 2C250×75×20×2.2 back-to-back double C, LT2 H300×150×3.2×4.5 and LT3 H300×150×4.5×6 high-frequency welded H purlins, laid on a 1,465 mm main spacing with edge lines at 1,000–1,011 mm, braced by roof-plane cross ties. Sections and spacing come from the drawings; loads, panel type, length and weight follow the original roof design.