3 Purlin Types, 1,465 mm Spacing: 2C250×75×20 Twin-C and H300×150 High-Frequency Welded H Sections, Q355B Roof Framing
English Version
Title: Steel Roof Purlin System — LT1 2C250×75×20×2.2 Twin-C, LT2/LT3 H300×150 High-Frequency Welded H, Q355B, 1,465 mm Main Spacing, Multi-Bay Roof Frame
Drawing note: sections and grades are read from the section table; purlin spacing and axis layout from the two roof plans. This batch does not list purlin length, count, weight, roof panel gauge, roof slope or wind load; those remain on the original roof schedule and structural drawings.
Overview
This is the purlin layer above the roof frame. Three Q355B section types are used: LT1 a back-to-back double C purlin 2C250×75×20×2.2, and two high-frequency welded H purlins — LT2 H300×150×3.2×4.5 and LT3 H300×150×4.5×6. Purlins run across the roof bays at a main spacing of 1,465 mm, with 1,000–1,011 mm edge spacing. Horizontal bracing fills the panel triangles between purlin lines; openings and equipment zones are shown as framed rectangles.
Section Table
表格
| Mark |
Section |
Type |
Grade |
| LT1 |
2C250×75×20×2.2, channels back-to-back |
Cold-formed C section, double channel |
Q355B |
| LT2 |
H300×150×3.2×4.5 |
High-frequency welded H section |
Q355B |
| LT3 |
H300×150×4.5×6 |
High-frequency welded H section |
Q355B |
Section format: H depth × flange width × web thickness × flange thickness; C depth × leg × lip × wall thickness.

Plan Layout
| Item |
Value |
| Main purlin spacing |
1,465 mm repeated across bays |
| Edge purlin spacing |
1,000 / 1,011 mm |
| Plan 1 axes (transverse) |
9, 10, 12, 14, 17, 19 |
| Plan 1 axes (longitudinal) |
D, E, G, H, J, L, M |
| Plan 1 transverse bays |
1,810 / 8,004 / 8,333 / 14,776 / 3,010 mm |
| Plan 1 longitudinal zones |
635 / 630 / 475 / 2,624 / 475 / 450 / 550 mm |
| Plan 2 axes (transverse) |
1, 2, 3, 4, 7, 9, 10 |
| Associated framing |
Main frame beams, horizontal bracing, framed openings |

How the Roof Purlin Works
- Purlins carry the roof panel. Purlins span between main frame beams and transfer panel dead weight, snow and wind uplift to the frame.
- Double C matches medium spans. LT1 twin C channels act compositely as a built-up section for purlin lines needing extra stiffness.
- H sections cover longer or heavier bays. LT2 and LT3 high-frequency welded H purlins carry deeper loads; web and flange thickness rise from 3.2/4.5 on LT2 to 4.5/6 on LT3.
- Bracing stabilizes the roof plane. Horizontal bracing triangles between purlin lines resist wind and erection sway, tying purlins to the frame.
- Openings stay framed. Rectangular zones around skylights, vents or equipment are kept within the purlin and beam grid.

Advantages
- Section range matches span — twin C, light H and heavy H cover short, medium and long purlin lines without over-sizing.
- Q355B throughout — one structural grade across purlins, consistent procurement and welding qualification.
- Regular 1,465 mm spacing — repeated bay rhythm simplifies panel cutting, fixing and future opening layout.
- High-frequency welded H — thin web, controlled welding, lighter than a rolled H for the same depth.
- Shop-ready members — sections are standardized for shop cutting, hole drilling and site bolted fixing.
Disadvantages / Limits
- Purlin load data missing — snow load, wind suction, panel weight and purlin span are not listed; section selection must be checked against the design roof load.
- Lateral torsional buckling — purlins need panel restraint or sag rods; unsupported H purlins can twist under uplift or gravity load.
- Built-up double C fit-up — back-to-back channels must stay in contact; gaps or missing fixing reduce the composite section.
- Roof panel and fixings unspecified — panel profile, gauge, fastener type and spacing are not in this batch; diaphragm action depends on the panel system.
- Data gaps — purlin length, quantity, member weight, connector cleats and bracing rod size are not given; takeoff needs the original material schedule.
Typical Use Cases
- Industrial workshop roofs on steel portal frames.
- Warehouse and logistics building roofs with regular purlin grids.
- Multi-bay steel factory roofs with equipment, vent or skylight openings.
- Commercial and exhibition steel roof framing.
- Retrofit roof purlin replacement over an existing frame.
Fabrication and Erection Notes
- Verify Q355B material certificates for C and H sections; confirm purlin grade against each marked location.
- Set out the 1,465 mm main grid and 1,000–1,011 mm edge lines from the frame axes; check the opening rectangles before fixing purlins.
- Place LT1 twin C on medium lines, LT2/LT3 H purlins on long or loaded lines; do not substitute sections without design review.
- Install horizontal bracing triangles before laying panels; check purlin alignment and sag-rod tension.
- Match connection cleats and bolt holes to the main frame beam; tighten bolts to the specified torque.
- Coat exposed ends and contact surfaces; keep drainage slopes and panel fixing lines clear.
Bottom Line
A Q355B steel roof purlin system: LT1 2C250×75×20×2.2 back-to-back double C, LT2 H300×150×3.2×4.5 and LT3 H300×150×4.5×6 high-frequency welded H purlins, laid on a 1,465 mm main spacing with edge lines at 1,000–1,011 mm, braced by roof-plane cross ties. Sections and spacing come from the drawings; loads, panel type, length and weight follow the original roof design.