2. Structural: 8 - Layer, single space 2.5×5.3m, load 3.6t/space.
3. Anti - Corrosion: Hot - Dip Galvanizing (275g/㎡) + Powder Coating, RAL colors.
4. Certification: CE EN 14010 Machinery Directive.
5. Customization: Wide SUV spaces, EV charging stations.
6. Construction: 30 days (15 days for shipping).
7. Maintenance: Remote Diagnostics System.
Galvanized Steel Plate Parking Garage: Durable, Efficient, and Customizable Solutions
Shenyang Zhongda Steel Structure Engineering Co., Ltd. is a leading manufacturer and supplier of Galvanized Steel Plate Parking Garage solutions. Our advanced technology, full-chain integration, and R&D-driven approach set us apart in delivering high-quality, long-lasting parking structures that meet the diverse needs of facility managers, property developers, and urban planners.
Product Description:
Our product systems offer a perfect blend of durability, efficiency, and customization. Designed to withstand harsh environmental conditions, these structures provide a cost-effective solution for maximizing parking capacity while ensuring safety and longevity. The hot-dip galvanized steel plates (275g/㎡) with optional powder coating offer superior corrosion resistance, reducing maintenance costs and extending the lifespan of your parking facility.
Key Features of Our Galvanized Steel Plate Parking Garage:
- Modular design for quick installation and minimal site disruption
- Smart access systems with license plate recognition and app reservation
- 8-layer design with customizable parking space dimensions (standard: 2.5×5.3m)
- High load capacity of 3.6 tons per parking space
- Integrated EV charging stations and wide spaces for SUVs available
- Remote diagnostics system for efficient maintenance
Quality Control: Ensuring Excellence in Every Project
At Zhongda, we maintain stringent quality control measures throughout the production process. Our ISO 9001-certified quality management system, combined with advanced non-destructive testing methods, ensures that every product meets the highest standards of structural integrity and performance.
Why Choose Zhongda ?
- Full-chain technical integration from R&D to construction
- 60,000-ton annual precision fabrication capacity
- Expertise in delivering over 60 landmark projects
- 70% client retention rate and 20-30% lead time reduction
- Compliance with international standards (EN 1090, AWS, JIS)
Production Process: Precision and Efficiency
Our state-of-the-art facility, featuring CNC ultra-thick plate cutting, 3-axis CNC drilling systems, and automated welding lines, ensures high-precision, high-efficiency production of your Galvanized Steel Plate Parking Garage components.
OEM & ODM: Tailored Solutions for Your Unique Needs
We offer comprehensive OEM and ODM services for product projects. Our experienced team works closely with clients to develop customized solutions that address specific requirements:
- Smart Access: Implement cutting-edge license plate recognition and app reservation systems, reducing average access time to less than 90 seconds.
- Structural Customization: Adapt the 8-layer design to your space constraints and capacity needs.
- Anti-Corrosion Solutions: Choose from a range of RAL colors for powder coating over hot-dip galvanizing.
- Special Features: Integrate wide spaces for SUVs or EV charging stations to future-proof your parking facility.
Project Cases: Proven Success in Diverse Applications
Our product solutions have been successfully implemented across various projects:
- University Campus Expansion: 500-space structure with integrated smart access system
- Hospital Modernization: 300-space facility with EV charging stations and contactless payment
- Urban Redevelopment: 1000-space multi-level garage with mixed-use retail spaces
Certifications: Meeting Global Standards
Our product systems are CE EN 14010 Machinery Directive certified, ensuring compliance with international safety and quality standards.
Packaging and Delivery: Efficient and Secure
We provide secure packaging and reliable delivery services, with a typical 30-day timeline for installation and commissioning, including 15 days for equipment shipping.
FAQ: Addressing Your Concerns
Q: How long does it take to install a product?
A: Typically, installation and commissioning take 30 days, including 15 days for equipment shipping.
Q: What maintenance support do you offer?
A: We provide a remote diagnostics system and guarantee a fault response time of less than 4 hours.
Q: Can the parking garage be customized for electric vehicles?
A: Yes, we offer integrated EV charging stations as a customization option.
Contact Us
Ready to maximize your parking capacity with a durable, efficient Galvanized Steel Plate Parking Garage? Contact us at Ava@zd-steels.com for a personalized consultation and quote.
YOU MAY LIKE