9 Q235B Tube Sections, 1,400 mm Grid, 6.3 m Axial Bay: Steel Platform with 300×200×8 Frame Beams and 200×12 Columns

2026-11-22 22:05:14

9 Q235B Tube Sections, 1,400 mm Grid, 6.3 m Axial Bay: Steel Platform with 300×200×8 Frame Beams and 200×12 Columns

English Version

Title: Structural Steel Platform — 9 Q235B Hollow Sections, GKL1 300×200×8 Frame Beam, GKZ1 200×12 Column, 1,400 mm Beam Spacing, 6,300 mm Bay

Drawing note: member grades and sections are read from the member material list; plan spacing from the C-C section and standard plan. The drawings do not list platform elevation, live load, deck plate thickness, member lengths, weights or foundation type; these remain on the original design.


Overview

This is a welded rectangular-tube steel platform, all members in Q235B. A GKL1 perimeter frame of 300×200×8 rectangular tube carries GL1 secondary beams on a 1,400 mm spacing; GKZ1 200×12 square-tube columns support the frame. The C-C bay measures 6,300 mm on axis, divided into 3,075 + 3,075 with a 150 mm edge. Diagonal braces in LG1 stabilize the panel; LG2/LG3/LG4/LG5 cover edge beams, railing and stair connections.


blog-397-364


Member Schedule (Q235B)

 

Mark Section Role
GKZ1 □200×12.0 square tube Main frame column
GKL1 □300×200×8.0 rectangular tube Frame beam
GZ1 □200×100×6.0 rectangular tube Secondary column
GL1 □200×100×6.0 rectangular tube Platform secondary beam / diagonal brace
LG2 □150×100×6.0 rectangular tube Edge / stair beam
LG4 □150×100×6.0 rectangular tube Edge / stair beam
LG3 □150×6.0 square tube Edge member
LG1 □100×6.0 square tube Railing / light brace
LG5 □100×6.0 square tube Railing / light brace

Plan Dimensions

表格

Item Value
C-C bay, axial 6,300 mm; interior 3,075 + 3,075; edge 150 mm
Secondary beam spacing 1,400 mm (standard plan)
Edge cantilever 700 mm each side
Edge bands (C-C, side) 100 / 900 / 2,850 / 900 mm
Outer stair-side bands 50 / 900 / 950 / 950 / 1,000 mm
Axes shown 3-1, 3-G, 3-F, 3-B, 3-D, 3-C

blog-487-388


How the Platform Works

Frame beams span between columns. GKL1 300×200×8 forms the perimeter and main bays; it carries secondary beams to the columns.

Secondary beams carry the deck. GL1 200×100×6 runs at 1,400 mm spacing and distributes deck load to the frame.

Columns transfer load to the base. GKZ1 200×12 main columns and GZ1 secondary columns take frame reactions to foundations.

Diagonals resist lateral load. LG1 diagonal braces in the panels stabilize the platform against wind and installation shifts.

Edge members finish the perimeter. LG2/LG4 edge beams, LG3 square tube and LG1/LG5 railing tubes close the sides and stair opening.


blog-612-510


Advantages

Prefabricated tube construction — hollow sections shop-fabricated, bolted or welded on site; fast erection.

Regular 1,400 mm grid — repetitive beam bays simplify detailing, deck layout and future openings.

Light section range — 6–12 mm wall thicknesses match each member's role; no oversized steel.

All one grade, Q235B — procurement and welding qualification are consistent across the platform.

Open framing — easy to run pipes, cable trays and maintenance access under the deck.


Disadvantages / Limits

Deck system unspecified here — tread plate, grating or concrete fill and its thickness are not on these drawings; deck span capacity must be checked separately.

Lateral stability depends on braces and columns — diagonal layout and column base fixity control sway; weak bases or omitted braces reduce rigidity.

Hollow-section corrosion — enclosed tubes need drainage seals and edge coating; exposed platforms need scheduled repainting or galvanizing.

Connection design not detailed here — bolt size, weld size, base plate and anchor bolts are not listed; joints need the connection drawings.

Load data missing — platform live load, equipment load and impact load are not stated; member sizes must be verified against the actual design loads.


Typical Use Cases

Industrial maintenance and inspection platforms along production lines, tanks or equipment.

Pipe rack and cable-tray support platforms in plants, refineries and power stations.

Building mezzanines for storage, offices or auxiliary equipment over ground-floor space.

Stair and access tower landings connecting stairs at intermediate levels.

Temporary or permanent viewing and working platforms in commercial venues, stadiums and transport hubs.


Fabrication and Erection Notes

Verify Q235B mill certificates for all square and rectangular tubes.

Lay out the 1,400 mm secondary beam grid from the frame centerlines; check the 6,300 mm bay and 700 mm edge cantilever.

Match GKL1 300×200×8 to main spans, GKZ1 200×12 to main columns; do not substitute lighter sections without design review.

Weld or bolt braces before loading the frame; check diagonal alignment in each panel.

Seal tube ends and drill drainage holes where tubes are exposed; coat edges and contact surfaces.

Confirm deck type, railing height and stair connection against the general arrangement before handover.


Bottom Line

A Q235B steel platform built from nine tube sections: 300×200×8 frame beams, 200×12 main columns, 200×100×6 secondary beams on a 1,400 mm grid, 6,300 mm axial bay with 700 mm edge cantilevers, and LG-series edge, railing and brace tubes. Sections and spacing come from the drawings; elevation, loads, deck plate and connections follow the original structural design.

**WhatsApp**: +86‑13889862778, +86‑18242444407
**Email**: eddie@zdsteels.com, wells@zdsteels.com

Previous article: 24.8 m Curved Span, 10.3 m Twin-Cell Box Expressway: 1.6 m Deep Section, 5% Cross Fall, 100 mm Asphalt Deck